Barry County Planning Office Fee Schedule
Effective January 1, 2022
Directed by the Barry County Board of Commissioners
After The Fact Permit Fee $250.00
Zoning Permits
Decks, Porches, Signs, Farm Buildings, Lean-to (standing alone) $25.00
Any other construction (Houses, In-ground Swimming Pools, $50.00
Detached Accessory Buildings over 200 sq ft,
and lean-to attached to existing building)
Land Division Permit (1 parcel) $75.00
Each additional proposed parcel $20.00
Appeals
Construction Board of Appeals $250.00
Special Use or Variance $300.00
Site Plan Review $250.00
Rezoning Request (Map Change) $500.00
Text Amendment $400.00
Special Meeting of the Planning Commission or Zoning $400.00
Board of Appeals plus the regular fee listed above
(for meetings other than normally scheduled)
Master Plan Amendment $250.00
Rehearing Fee $250.00
Publications
2005 Master Land Use Plan (Full text and maps) $75.00
2005 Electronic Master Land Use Plan (CD Version) $10.00
Zoning Ordinance (with amendments or revised) $75.00
Set of Zoning Maps $50.00
Single Map $5.00
Copying Fee per page $1.00
An “After the Fact Permit Fee” shall be charged when construction or plan is started prior to
obtaining a zoning, land division, or soil erosion permit.
Soil Erosion & Zoning Permits are valid for a maximum of twelve (12) months
from the date issued. A permit may become invalid or be revoked before the end of the
twelve (12) month period under conditions stipulated in the Zoning Ordinance or when
the final inspection has been approved.
Land Division Permits are valid for a maximum of six (6) months from the date
issued (deeds or surveys must be recorded within that time frame).
Barry County Planning Office Fee Schedule 2022 Page -2-
Soil Erosion & Sedimentation Control Fee Schedule
Effective January 1, 2022
PROJECT TYPE
PLAN REVIEW
PERMITS W/ INSPECTIONS
(Up to 10 Inspections)
Single family residential, Two family residential
$100.00 up to 10 acres
Farm Buildings & Porches
$25.00
Additions, garages, accessory buildings,
In-ground swimming pools,
other similar uses
$50.00
Transportation Facilities
Including private roads, streets, highways,
railroads, mass transit facilities, except normal
maintenance procedures.
Common carrier pipelines, except normal
maintenance procedures
$25.00
$25.00
Up to 1 mile = $100.00;
each additional mile or
fraction $30.00
Up to 1 mile = $75.00;
each additional mile or
fraction = $10.00
Subdivisions
Plat developments, mobile home parks, multiple
housing units (more than 2 housing units) &
planned unit developments
$150.00 up to 10
acres; $10.00 for
each additional acre
or fraction thereof
Up to 10 acres = $100.00;
each additional acre or
fraction = $10.00
Industrial & Commercial Developments
Except normal maintenance problems
$150.00 up to 10
acres; $10.00 for
each additional acre
or fraction thereof
Up to 10 acres = $100.00;
each additional acre or
fraction = $10.00
Service Facilities
Including but not limited to sanitary landfills,
airports, churches, schools, except normal
maintenance procedures
$150.00 up to
10 acres; $10.00 for
each additional acre
or fraction thereof
Up to 10 acres = $100.00;
each additional acre or
fraction = $10.00
Recreational Facilities
Including but not limited to campgrounds, golf
courses, parks, ski slopes & trails, except
normal maintenance procedures
$150.00 up to
10 acres; $10.00 for
each additional acre
or fraction thereof
Up to 10 acres - $100.00;
each additional acre or
fraction - $10.00
Barry County Planning Office Fee Schedule 2022 Page -3-
PROJECT TYPE
PLAN REVIEW
PERMITS W/ INSPECTIONS
Utilities
Including but not limited to underground cables,
conduit or pipelines, except pole installation,
service lines & normal maintenance procedures
Including but not limited to substation
construction & pumping stations, except normal
maintenance procedures
$25.00
$25.00
Up to 1 mile = $75.00;
each additional mile or
fraction = $10.00
Up to 1 mile = $75.00;
each additional mile or
fraction = $25.00
Water Impoundments & Ponds
Except normal maintenance procedures
$25.00
Up to 1 acre = $30.00;
each additional acre or
fraction = $10.00
Wells
New residential water wells, oil, gas & mineral
wells except the installation of wells under
permit from the supervisor of wells & wherein
the owner operator is found by the supervisor of
wells to be in compliance with the conditions of
the sediment act
$25.00
Up to 10 acres = $75.00;
each additional acre or
fraction = $10.00
Miscellaneous Earth Movements
(Not included in above fee schedule); Includes
removing soil from one location to another, etc.
Additional inspections requested by permit
holder or inspections required by weather
conditions that might occur through laxity on the
part of the permit holder in his/her control of
temporary erosion practices
$25.00
Up to 5 acres = $25.00;
each additional acre or
fraction = $5.00
$25.00 each